Products & Newsletters
Effects of Tower Standard 222G
The ANSI/TIA/EIA-222 tower standard, now in its 61
Under G, a more comprehensive look at structure performance is taken. Two limit states, or conditions, for each structure are considered. Under the strength limit state, compliant structures are safe under the most extreme of loading conditions. The serviceability limit state ensures that the structure in question is capable of providing the desired service under normal conditions.
Gone is the fastest mile wind speed concept that had been previously utilized. Mainly the change here is due to the way the National Weather Service and other agencies measure wind speed. The new accurate methodologies to determine wind speed have translated into the change in the standard whereby wind loading is calculated according to a three-second wind gust to accommodate instantaneous loads. Most of the sites used by the Weather Service record three-second-gust wind speeds, so more accurate averages are available for G and subsequent revisions should this methodology be continued.
In addition to the changes for wind loading, we also find considerations different for ice and seismic loads. Ice loads are escalated with height, as are wind loads, and G is the first version of the standard that seriously addresses earthquake loading. In general the seismic provisions should have minimal impact on broadcast structures unless the structure is irregular in some fashion. In the case of ice loading, older towers with no such consideration will almost certainly see their capacity decrease. Conversely, towers designed for a higher wind speed combined with certain ice thicknesses may see their capacity increase. The end result, of course, is that your tower may move into an overloaded condition, or be ripe for additional revenue.
-- continued on page 2
Acceptable Use Policy blog comments powered by Disqus
[an error occurred while processing this directive]
Today in Radio History
Milestones From Radio's Past
The history of radio broadcasting extends beyond the work of a few famous inventors.
EAS Information More on EAS
FCC Publishes Fifth Report and Order on EAS
The new rules take effect April 30, 2012.
FEMA Releases 2012 Supplemental Guidance Report
The purpose of the document is to promote consistency in policy across Federal grant programs, and to ensure compatibility among Federally funded projects.
EAS/CAP FAQ
Now that FEMA has adopted the CAP1.2 standard, broadcasters are asking questions about the deadline to install equipment and updates to the EAS rules.
NWS XML/Atom Feed for CAP Messages
The feed provides feeds for all US states and territories.
How Much Data in CAP?
Now that the IPAWS OPEN server is on-line, it makes sense to get your CAP-enabled EAS equipment going.
Wallpaper Calendar
Radio 2012 Calendar Wallpaper
Need a calendar for your computer desktop? Use one of ours.
The Wire
A virtual press conference
Information from manufacturers and associations about industry news, products, technology and business announcements.
Current Issue
Inside the Radio Network
Take a peek into Dial Global to see how the syndicator delivers programming to your station.
Browse Back Issues
[an error occurred while processing this directive]Also in the May Issue
Sections


