Safety in the Workplace


        Radio on FacebookJoin us on Facebook

RF equipment distributor, Tessco, has published what I consider to be the best list of mistakes made by tower crews:

Mistake #6: Failure to Have a Proper Climb Plan

Working on a tower involves coordinating with the carrier contracting the work, tower owners and other carriers that share the tower or operate from nearby towers before stepping on the first rung. During the planning process, consider the following:
■ Do you have the appropriate work permits?
■ Do the carriers know the day(s) and time(s) of day that installers will be on the tower?
■ Have arrangements been made to ensure reduced RF transmission levels while the installers are on the tower?
■ Has a proper Lockout-Tagout (LOTO) procedure been implemented in order to protect personnel on the tower, especially if RF transmitters are controlled remotely?

Mistake #5: Lack of Proper Warning Signage

By using the proper warning signage, climbers receive a clear, bold message that they are entering a hazardous zone. If communications towers lack such signage, climbing them should be avoided until the RF conditions can be verified by both the occupying carriers and the tower owners.

Mistake #4: Insufficient OSHA-/NATE-Recognized Training or Tower Climbing Certification

Climbing communications towers is a specialized skill. Many experienced climbers are instinctive in how they move up and down a tower, but the skills associated with the job need to be updated periodically with the latest techniques and climbing safety measures.

It is critical to note that as the demand for new tower sites or add-ons to existing sites continues to expand, new, and often-inexperienced climbers are joining tower crews. OSHA-recognized certification courses are recommended for new climbers who require basic climbing skills, and for experienced climbers who can expand their skills, including how to handle rescue situations.

Mistake #3: Keeping Climbing Safety Gear in Good Repair/Within Allowable Dates-of-Use

All climbing safety gear comes with an expiration date. The reason is that with extensive use, harnesses, straps, and clips become worn and stressed to the point where they may not perform as intended at a critical time. Don’t take unnecessary chances. If any safety gear has an allowable date-of-use that has expired, do not attempt to use that gear beyond that date.

Mistake #2: Climbing With Inadequate Safety and Protection Gear

Weather and hazardous conditions that exist high on a tower are not always evident on the ground. Experienced climbers recognize that before attempting to scale a tower, they must be fully suited with a helmet, safety glasses, gloves, jackets, pants, boots, as well as outfitted with a safety harness, lifeline, carabiners, lanyards, rope grabs, and tool belts. Taking shortcuts is never a good idea. The investment in all the necessary equipment and gear will pay off the first time it’s needed several hundred feet in the air.

Mistake #1: Failure to Keep an RF Personal Alarm Turned On at All Times

Consider the case of a climber wearing an RF suit and an RF personal monitor while working on a TV broadcast tower. He initially climbed the tower after all three FM antennas on the tower had been reduced to 10 percent of their normal operating levels. Even at reduced power, however, it was determined that RF field levels were still too strong for the climber to be safe, so the transmitters were turned off. The climber then removed the hood of his protective suit, shut off his RF personal monitor, and climbed back up the tower. It was only when he noticed that his legs were getting warm and his RF suit was starting to smoke that he realized the transmitters were turned back on, and he hustled back down to safety.

Keeping the RF personal monitor turned on at all times is critical. You can’t see RF signals. Using the RF personal monitor is the only way to know whether RF signal levels are above the FCC’s Maximum Permissible Exposure (MPE) limit. Leave it on, and wear it on the outside of the RF suit. It will save your life!

Final thoughts

It is always a good practice to ensure there is a current structural analysis for every tower you own or lease. Obviously this should go without saying for additions of any new equipment, but it should also be performed when any antenna and/or line is being replaced. Codes have changed significantly over the past few years. The last thing you need is a tower failure to occur while they are changing the equipment and without a current/proper structure your company could be on the hook for liability and damages.

Before any tower work is performed, you should hold a pre-climb safety meeting to discuss the work to be done. Any workers climbing the tower should have current Climb Cards in their possession and you should ask to see them.


Climbers must understand and operate under a number of regulations and requirements.

■ ANSI/ASSE Z359.0-2007: Definitions and Nomenclature Used for Fall Protection and Fall Arrest

■ ANSI/ASSE Z359.1-2007: Safety Requirements for Personal Fall Arrest Systems, Subsystems and Components

■ ANSI/ASSE Z359.2-2007: Minimum Requirements for a Comprehensive Managed Fall Protection Program

■ ANSI/ASSE Z359.3-2007: Safety Requirements for Positioning and Travel Restraint Systems; ANSI/ASSE Z359.4-2007 - Safety Requirements for Assisted-Rescue and Self-Rescue Systems, Subsystems and Components

■ ANSI/ASSE Z359.6-2009: Specifications and Design Requirements for Active Fall Protection Systems

■ ANSI/ASSE Z359.12-2009: Connecting Components for Personal Fall Arrest System

■ ANSI/ASSE Z359.13-2009: Personal Energy Absorbers and Energy Absorbing Lanyards

■ ANSI/ASSE Z359.1-1992 (R1999): Historical Document


McNamara is president of Applied Wireless, Cape Coral, FL.




Acceptable Use Policy
blog comments powered by Disqus

[an error occurred while processing this directive]

Today in Radio History

Milestones From Radio's Past

The history of radio broadcasting extends beyond the work of a few famous inventors.

Digital Edition

Each Issue as a Digital Edition

Read each issue online in our Digital Edition Format in your Web browser.

EAS Information More on EAS

NWS XML/Atom Feed for CAP Messages

The feed provides feeds for all US states and territories.

Wallpaper Calendar

Radio 2014 Calendar Wallpaper

Need a calendar for your computer desktop? Use one of ours.

The Wire

A virtual press conference

Information from manufacturers and associations about industry news, products, technology and business announcements.

Join Us Facebook Twitter YouTube LinkedIn
Radio magazine cover

Current Issue

The Motor Racing Network Takes to the Road

When building its new broadcast production vehicle, MRN applied lessons learned from the past.

Browse Back Issues

[an error occurred while processing this directive]