Maximizing Tower Assets


        Radio on FacebookJoin us on Facebook

Get rid of unused equipment on the tower or rooftop. Curb appeal creates a good first impression. Like home buyers, most site acquisition contractors find potential collocation candidates by driving around a specific area that has been identified by the wireless operator as a place it needs to have a site; this is called a search ring, usually a mile in diameter or less. Towers and rooftops that have excessive equipment may appear to have little opportunity for another tenant, possibly causing the site acquisition contractor to look for easier candidates. While you are clearing unused equipment off the tower have the tower company provide an updated map of the tower including antenna/transmission line types, elevation, mounting (which leg or face), any structural modifications, etc. Follow this with getting a full structural analysis (under the current structural code) performed by a qualified structural engineer; this will give you a baseline of what structural capacity is available. This should also be provided to anyone that inquires about leasing space. Tip: Even if your tower is at or near capacity, it is not unusual for wireless carriers to perform structural upgrades at their cost. I've had carriers spend more than $100,000 upgrading a tower that would cost $80,000 to replace. I've also had carriers extend existing or completely replace towers, and the owner keeps the new tower.

Understand the zoning requirements where the tower/rooftop is located. Most municipalities have ordinances specifically for communications towers and rooftop sites. In general, these ordinances were enacted only in the past 10 years. Any towers or rooftop installations built prior to those ordinances are grandfathered until a material change is made to the site. It is important to understand specifically how the ordinance affects the ability of a potential tenant to locate on this asset. Consider that most broadcast transmitter sites were built many years ago on the cheap real estate outside of town. Now these same sites are surrounded by residential developments, commercial buildings and highways. Even adding new antennas to an old tower may invoke the need to get a variance or some other approval. Getting a variance typically requires at least a hearing before the appointed board and in most cases, that notifications are sent to all adjacent property owners; basically the same people who aren't happy there is a tower there in the first place. Tip: If a carrier wants to lease your site, it will assume all the expenses associated with the zoning/permitting process. A representative from the tower/rooftop ownership may also need to attend since application can only be made by the legal owner of the property. Keep in mind that some of these hearings draw a good amount of crowds and press coverage that may not reflect well on the owner.

Watch your current tenants. Many stations already have wireless tenants leasing space on assets. If you are responsible for managing these sites it is important that you have copies of the lease documents available. You should also be aware of any new changes -- renewal, modifications or amendments to the lease. Understand the lease terms for the amount of antennas and transmission lines, size of antennas and transmission lines, ground equipment space and electrical requirements. Annually verify this information against what is actually on site. Tip: As wireless technology grows the carriers look for ways to add equipment while staying within the lease terms. For example, some leases do not specify an amount of transmission lines, just antennas. There are now panel antennas that use up to eight lines per panel, not very common but possible.

Beware of lease renegotiation letters. Most carriers are actively trying to renegotiate existing leases. They have contracted with one of a few companies that have been formed for the specific business of renegotiating wireless leases. The renegotiations come in the form of reduced rent, longer terms or one-time buyout (payment) in return of no additional rent over an extended period. These companies get paid on a percentage of the savings, similar to collection companies. Some threaten that the carrier is going to leave the site and you will get no more revenue. If you have received such a letter, find a consultant who has experience with wireless carriers before trying to negotiate; such consultants can provide a higher level of guidance in dealing with these companies and the carriers to keep the revenue flowing for a long time.


McNamara is president of Applied Wireless, Cape Coral, FL.




Acceptable Use Policy
blog comments powered by Disqus

[an error occurred while processing this directive]

Today in Radio History

Milestones From Radio's Past

The history of radio broadcasting extends beyond the work of a few famous inventors.

EAS Information More on EAS

NWS XML/Atom Feed for CAP Messages

The feed provides feeds for all US states and territories.

Wallpaper Calendar

Radio 2014 Calendar Wallpaper

Need a calendar for your computer desktop? Use one of ours.

The Wire

A virtual press conference

Information from manufacturers and associations about industry news, products, technology and business announcements.

Join Us Facebook Twitter YouTube LinkedIn
Radio magazine cover

Current Issue

KBEM-FM: Revitalizing a Station, Reviving a School

Minneapolis Public Schools upgrades their aging equipment with new Audio over IP technology

Browse Back Issues

[an error occurred while processing this directive]