Reconstructing WEBE 108 and WICC
Cumulus tackles the challenge of an in-place rebuild.
One other surprise was presented when it came time to install the wire ladder. A misunderstanding resulted in the wire ladder not being ordered. Fortunately, Middle Atlantic was not too far away in New Jersey. One interesting installation note is that the ladder in the TOC is not suspended from the ceiling (which would have been a eight-foot length of all-thread around HVAC and plumbing), but rather mounted on the rack tops. This simplified not only the ladder installation, but also the wire installation because it could be laid on top rather than threaded through support rods.
The back of the racks and the punch blocks in the TOC
The entire project from the first demolition of walls until everything was installed an on-air took nearly 10 months. Much of this was because of the project being in-place, but the construction crews were also based out of town, so there was an ongoing back-and-forth of crews coming to town to work, then taking off again. In the end, it all came together. The previous studios worked well for 20 years. The new studios are poised to serve another 20.
Project Crew
Randy Shull, contract eningeer
Yancy McNair, Cumulus Pensacola
Radio Engineering Services
Dave Kerstin, BGS
Ken Skok, Axia
Dave Supplee, Cumulus
Equipment List
Acoustics First Sonora
Alesis Monitor One MKII
APC SUA2200
AudioScience ASI6585
Axia Element, Iprobe, Pathfinder Pro, Powerstation
Belden 1872A MediaTwist
BSI Op-X
Cable to Go CAT-6 wire
Data Center Depot wire ladder
E-V RE-20
Krone blocks
Middle Atlantic MRK Series
O.C. White Elite
Omnirax Innova
Radio Systems headphone amps
Telos NX12
Acceptable Use Policy blog comments powered by Disqus
[an error occurred while processing this directive]
Today in Radio History
Milestones From Radio's Past
The history of radio broadcasting extends beyond the work of a few famous inventors.
EAS Information More on EAS
FCC Publishes Fifth Report and Order on EAS
The new rules take effect April 30, 2012.
FEMA Releases 2012 Supplemental Guidance Report
The purpose of the document is to promote consistency in policy across Federal grant programs, and to ensure compatibility among Federally funded projects.
EAS/CAP FAQ
Now that FEMA has adopted the CAP1.2 standard, broadcasters are asking questions about the deadline to install equipment and updates to the EAS rules.
NWS XML/Atom Feed for CAP Messages
The feed provides feeds for all US states and territories.
How Much Data in CAP?
Now that the IPAWS OPEN server is on-line, it makes sense to get your CAP-enabled EAS equipment going.
Wallpaper Calendar
Radio 2012 Calendar Wallpaper
Need a calendar for your computer desktop? Use one of ours.
The Wire
A virtual press conference
Information from manufacturers and associations about industry news, products, technology and business announcements.
Current Issue
Inside the Radio Network
Take a peek into Dial Global to see how the syndicator delivers programming to your station.
Browse Back Issues
[an error occurred while processing this directive]Also in the May Issue
Sections