New Hampshire Public Radio


        Radio on FacebookJoin us on Facebook

Twice the space and an open road to future expansion

Dan Colgan broadcasts the first show from the new studios of NHPR.

Dan Colgan broadcasts the first show from the new studios of NHPR.

Every station move or rebuild project is set into motion because of some fundamental need. Sometimes the equipment has fulfilled its useful lifespan. Sometimes a format change makes the facility inefficient. Sometimes simply more room is needed. For New Hampshire Public Radio, it was all of the above.

In the spring 2001, NHPR had been in a facility that was only 10 years old. When it was built in 1991, the network was producing a classical music format, and the sit-down studios and analog routing served the needs adequately. But after a format change in 2001 to a news/talk format, it was quickly realized that the music-centric facility had severe limitations. It was just not going to meet the long-term business and programming needs.

The first step: Conduct a needs assessment study. NHPR worked with its board of directors to plan what was desired and how it would be funded. The realization that the North Main Street facility was not ready to serve NHPR's future needs was a primary point. The plans were set into motion for a facility upgrade.

NHPR now distributes programming to six full-power stations and six translators in the state. While all the transmitter facilities carry the same programming, the ability to distribute different material to different sites was a desired option. Likewise, as the stations adopt HD Radio, providing various multicast streams was a consideration. Flexible routing was also a checklist item.

Like any station, being off the air is an unacceptable circumstance, so multiple levels of redundancy were built into the plan. Finally, additional space was needed to accommodate the growth of the network.

A new building

Once the needs were determined, the process of finding a new location began. It didn't take long to find one. An office condominium on Pillsbury Street was looking for tenants. This was almost a new building in some ways, even though the previous owner — Blue Cross Blue Shield — had moved out in 1990. The building sat vacant for many years because of asbestos building materials within.

(Left to right) Bob Smith and Mark Bisbee, Technet; Dan Colgan, Scott McPherson and Michael Saffell, NHPR.

(Left to right) Bob Smith and Mark Bisbee, Technet; Dan Colgan, Scott McPherson and Michael Saffell, NHPR.

In 2003 and 2004 a developer worked with the city remove the asbestos and prepare the building for new tenants. NHPR then began raising money for its relocation project, and in spring 2006 purchased the sixth floor (top floor) of the building. But NHPR wasn't ready to begin building. It would be two more years before that would happen.

Plans were further refined while funds were being raised. In April 2008, NHPR issued a request for construction bids. By May, the bids were received and the station selected North Branch Construction. On June 2, 2008, the initial construction began.



Acceptable Use Policy
blog comments powered by Disqus

[an error occurred while processing this directive]

Today in Radio History

Milestones From Radio's Past

The history of radio broadcasting extends beyond the work of a few famous inventors.

EAS Information More on EAS

NWS XML/Atom Feed for CAP Messages

The feed provides feeds for all US states and territories.

Wallpaper Calendar

Radio 2014 Calendar Wallpaper

Need a calendar for your computer desktop? Use one of ours.

The Wire

A virtual press conference

Information from manufacturers and associations about industry news, products, technology and business announcements.

Join Us Facebook Twitter YouTube LinkedIn
Radio magazine cover

Current Issue

“Free Beer” and “Hot Wings” in the Morning

Townsquare Media's WGRD builds a new studio for their syndicated morning show including video

Browse Back Issues

[an error occurred while processing this directive]